Yinson

Integrating real-time data with AVEVA PI System and AVEVA Engineering to increase efficiency and sustainability

Global floating production, storage and offtake vessel manufacturer, Yinson, has worked with AVEVA Engineering for several years to streamline data management and boost efficiency. As it grew in size and assets, Yinson realized that it needed even more control of its data to achieve its aims. It combined AVEVA PI System with AVEVA Engineering, making new data available online daily. With this data, Yinson can now optimize its operations and take steps toward achieving net zero emissions by 2050.  

"By implementing AVEVA PI System we were actually able to collect real-time data from the assets in operation."

Kari Berte Bye, Technical Data Manager - Yinson

Goals

  • Streamline complex vessel design.
  • Structure and analyze data to enable analysis and optimization.
  • Reduce greenhouse gas emissions by 2030 by 30%.

Challenges

  • Growing number and size of assets across the globe made it difficult to control data.
  • Duration and multidisciplinary nature of projects hampered data sharing and collaboration.
  • Capturing greenhouse gas emissions across operations to calculate baseline for future reductions.    

Solutions

Results

  • Increased real-time data enables more efficient maintenance.
  • Data integration empowers increased collaboration across teams.
  • Moved from monthly calculations of greenhouse gas emissions to daily monitoring.

AVEVA Engineering

AVEVA Engineering enables multi-discipline engineering teams to work together to develop and maintain key engineering items involved in plant or marine projects.

Related Success Stories

Stay in the know: Keep up to date on the latest happenings around the industry.

Contact AVEVA
Live Chat
Schedule Demo