PlanetTogether Advanced Planning and Scheduling (APS)

By: PlanetTogether

Company-wide production visibility that is validated for material and capacity bottlenecks. Schedule optimization prioritizes work for on-time delivery and improves throughput by avoiding excessive setups, allowing you to respond with agility and ship on time.

 

Planning & Scheduling Automation (with Manual Overrides)

Start with manual scheduling, or capture your production constraints and policies in the system to automate the schedule generation process.

Once you have the data you need, you can create schedules in seconds not hours. This frees your planners to use their experience to improve the business and make the tough decisions that only humans can make.

Planners can override resource assignments, sequences and priorities if needed, achieving the perfect balance between automation and expert control.

 

Flexible, Multi-Factor Optimization

With easy to use PlanetTogether Optimization “sliders”, you have the flexibility to take several competing goals into account simultaneously.

Drive production batching efficiencies while also prioritizing important orders and hitting ship dates.

You can easily experiment too, seeing the impact of production management policies on projected inventory, on-time delivery, cash flow, and even custom metrics.

 

Precise Impact Analysis

Do you make decisions such as order expedites with limited information about downstream impacts? Pull one order in and five more push late.

With PlanetTogether you’ll know in seconds exactly which orders will be affected and by how much.

Better information will translate to better decisions for your business.

Specifications

Type

Software

Optimized Scenario

Make to order manufacturers looking to improve on-time deliver and increase production plan visibility.

Available on

PC
Cloud

Languages

English
English GB
French
German
Spanish
Portugese
Chinese (Simplified)
Chinese PRC
Italian
Japanese
Dutch
Indonesian
Polish
Turkish

Product Template

Application Offering for Software and SaaS

System Requirements

Microsoft SQL Server
Windows Operating System

 

Related Products

Production Scheduling Software

Enable Industry 4.0 with Simio's Forward Looking Digital Twin solution that produces a detailed production schedule and connects to the AVEVA Manufacturing Execution System to react to changes on the factory floor.

AVEVA™ Unified Supply Chain - Plan

Easily build, share, optimize and maintain planning models for refining, petrochemicals and mining, minerals, and metals operations.

AVEVA Manufacturing Execution System

Formerly Known As Wonderware MES

Maximize profitability, flexibility, quality, and compliance in manufacturing by digitally managing the rules and information for all operational activities and plant events in real-time. A work process-centric and Model-driven approach reduce the time to value and cost of ownership for both plant deployments and multi-site MES rollouts.

AVEVA Process Simulation

Formerly Known As SimCentral Simulation Platform

Design sustainable processes, products, and plants at the speed the market demands. AVEVA Process Simulation moves beyond linear, wasteful workflows to enable a circular, sustainable world.

Virsec Security Platform

Pioneering cybersecurity uniquely designed to protect SCADA, HMI, MES and other industrial software solutions within memory by guardrailing applications controlling industrial operations and processes to prevent dangerous attacks, like Stuxnet, Triton, Industroyer, Ransomware and more.

AVEVA System Platform, formerly Wonderware

Contextualize operations with responsive, standards-driven, and scalable software for deploying advanced SCADA, MES, and IIoT. Unify people, processes, and assets.

Related Services

MES Systems Services

Full services to implement optimized production processes, interfacing management systems and production lines while ensuring efficient operations and processes.

Requirements Definition - MES or Automation with ROI

Determining an overall roadmap and vision plan for automation and information systems is critical to the project approval and design. We will quickly understand the business problem, define requirements and demonstrate positive ROI.

EVANS Control Room Expertise Services

Manufacturer of control room consoles, technical furniture, and security rooms. Discover your next console and control room solutions with Evans.

Virsec IT/OT Risk Advisory and Assessment

Minimize risk and ensure operational integrity of critical infrastructure and defense systems, with expert assessment of overall risks and IT/OT security completeness and effectiveness

APEX Expertise Services

Enabling manufacturers to deliver on their brand promise. Working collaboratively to understand the culture. Bringing best fit solutions to the table. Our team is ready.

MES for Food Producers Solution Practice

Prebuilt and configurable solution for Order Management, Recipe Management and Batch Execution that provides producers more flexibility and better quality control on their production processes.

Unlock New Capabilities with AVEVA Partners

Contact Us
Contact AVEVA
Live Chat
Schedule Demo